New TopShim run:

version = topshim 2.3.0
date = 2023-05-25
time = 11:08:30.082
command = topshim 

FINE SHIMMING

Parameters:

probe = Z108618_0486
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration 2: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration 4: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 5: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.432

shim changes: 
Z	+131
Z2	+57
Z3	+76
Z4	+90
Z5	-7

duration = 1 min 34 sec
completed successfully
finished Thu May 25 11:10:03 2023


========================================================================